100-3 Pre-qualification of Architect and Engineering Consultants
100-4 Pre-qualification of Construction Contractors
100-8 Preparation of Plans and specifications for Electric Distribution Facilities for REB Borrowers
100-10 Pre-construction Conference
100-15 Store Manual
100-16 Insurance Coverage for REB Borrowers, Contractors, Engineers, Architects and Bond Requirements for Borrowers Contractors
100-17 Repairing of PBS Distribution Transformers in Local Workshop/Industries
100-21 Engineering and Staking Manual
100-22 Adequate grounding of Primary distribution Lines
100-24 Voltage and Current Investigations
100-27 Store Control manual
100-29 Sub-station Operation, Inspection and Maintenance Manual
100-30 Distribution, Operation, Inspection and Maintenance Instructions
100-32 Tool and Work Equipment Administration
100-35 Transformer Provision Policy
100-36 Transformer Rental Policy and Charges for PBSs Consumers
100-37 PDB Line Take Over Policy and Procedure
100-46 Import Procedure of Material and Equipment for necessary for Operation and Maintenance Purpose for each PBS Distribution System
100-48 Standard Specification and Drawing for 1.5 MVA 33/11 KV Pole Mounted Rural Type Sub-Station.
100-49 PBS Hot Line Work Administration
100-50 PBS Hot Line Work Operation
100-53 Storage and Handling of REB Timber Products Specialist
100-54 Standard for Inspection, Evaluation and Treatment of Standing Wood Poles.
|
Showing posts with label পবিস নিদেশিকা-১০০. Show all posts
Showing posts with label পবিস নিদেশিকা-১০০. Show all posts
Wednesday, May 2, 2018
পবিস নিদেশিকা-১০০
PBS INSTRUCTION SERIES - 100
Title : PBS Engineering and Materials